Sheker Construction

Cosmo Salon Studios

Salon & Retail • Taylor, Wayne County

Cosmo Salon Studios — Taylor — Sheker Construction
Location
Taylor, MI
Industry
Salon & Retail
Size
6,500+ SF
Timeline
14 weeks

Project Overview

Sheker Construction completed a full commercial build-out of the Cosmo Salon Studios facility in Taylor, MI. This multi-suite salon studio concept required transforming an existing commercial shell into a modern, fully-equipped salon facility with individual suites, each featuring independent plumbing, ventilation, electrical, and premium finishes. The project included a complete exterior renovation to establish a distinctive street presence and attract stylists and tenants.

1

The Challenge

The existing building had outdated MEP infrastructure that could not support the demand of multiple individual salon suites, each requiring its own plumbing for shampoo stations, dedicated electrical circuits for styling tools, and independent ventilation for chemical treatments. The exterior façade needed a complete transformation to reflect a modern salon studio brand.

2

Our Solution

We designed and executed a phased MEP distribution plan that delivered independent water, drain, electrical, and HVAC service to each suite without exceeding the building's existing utility capacity. The exterior received a full renovation with new storefront glazing, updated signage, façade materials, and site lighting. Interior finishes included luxury vinyl tile, custom millwork, LED lighting, and acoustic separation between suites.

3

The Outcome

Cosmo Salon Studios opened on schedule with all suites fully leased. The building's modern exterior and premium interior finishes attracted high-quality tenants and positioned the facility as one of the top salon studio destinations in the Taylor / Wayne County market. The independent MEP infrastructure allows each stylist to operate their suite as a private business.

Scope of Work

Full exterior façade renovation and storefront glazing
Interior demolition and new suite framing
Individual plumbing at each suite — hot/cold water and drain
Dedicated electrical circuits per suite for styling equipment
Independent HVAC distribution with individual controls
Chemical-grade ventilation for salon treatments
Luxury vinyl tile flooring throughout
Custom millwork and cabinetry per suite
LED lighting packages with dimming controls
Acoustic separation between suites
Common area and reception build-out
ADA-compliant restrooms and entry
New signage and exterior lighting
Fire protection and code compliance

Project Gallery

Cosmo Salon Studios project photo 1 — Sheker Construction

Start Your Commercial Project

Ready to build? Contact Sheker Construction for a free consultation on your next commercial project.